Saturday morning he took off the roof and by the afternoon he was installing the guttering.
Guttering almost complete |
The guttering was on the garage and replaced on the shed after a long day
First pieces of roof were on Well one job led to another then the water butts were raised and had to be reconnected. It is a good job it did not rain during all this work. |