Tuesday, March 11, 2008

Bedroom took a lot longer

We started on the bedroom after chirstmas but it has taken quite a long time, we have removed the old built in wardrobe that was too small and built in a much larger one, after the pieces were delivered we discovered that we needed to cut the height down by 10cm and there was a lot of cutting and fixing to fit the new unit into the space. Now we have lots of storrage.




If we were going to build in the wardrobes we thought we would go the whole way, new curtains, carpet new bedside cabinets and chest of draws. While we were about it we repositioned the electrictal fittings. The biggest problem was we had to let all the water out of the water bed and of course it had to be refilled.

Jake had a great time when he came for a visit helping us to get the air out of the bed, we eventually had Barry and Sarah helping as well



While taking tea with Val and Daph in Denners I spotted new lampshades for the bedside lamps and ceiling.



While we have been busy inside we havent managed to get much done in the garden but the weather has been very cold and wet so I do not supose we would have done a lot.

Posted by Picasa

No comments: